Restore I-94 Michigan
  • About
    • Project Map
    • Project Timeline
    • Maintenance of Traffic
    • Environmental Impacts
    • Photo Gallery
      • Summer 2026 Construction Progress
      • Existing Roadway Conditions
  • Information Center
    • News & Announcements
    • Public Meetings
    • Frequently Asked Questions
    • Noise Report
  • Contact
  • MiDrive Map
Closed on-ramp to eastbound I-94 blocked by striped barricades and a "Ramp Closed" sign. Concrete barriers and orange barrels line the road, and a crawler crane rises beside an overpass under construction.
Stacked concrete drainage pipes and manhole sections along a graded work area. In the distance, an "End Road Work" sign stands near overhead signs for southbound M-39 Southfield Freeway, marked closed, and Pelham Road.
Wide stretch of new gravel roadbed marked with orange survey paint. A road roller and traffic cones sit on the right, with trees lining both sides of the corridor.
Concrete batch plant with three tall silos standing behind a chain-link fence. A large gravel pile and an orange dump truck sit at the right.
Elevated view of a freeway work zone. A crawler crane sits on an earthen embankment at left, traffic moves through barrel-lined lanes, and a new concrete bridge pier stands at right with an overpass in the distance.
High view down the I-94 corridor. Traffic is shifted into a single barrel-lined lane beside an excavated area with drainage pipes and an excavator, with overhead exit signs visible far ahead
Crawler crane with a tall lattice boom on a graded dirt site. A black pickup truck and a Dan's Excavating storage container sit in the foreground.
Long stretch of new gravel base next to removed pavement. Freeway traffic, including a semi-truck, continues on the right, and an overhead sign structure is visible in the distance.
Excavator loading a dump truck on a gravel base partly covered with black fabric and drainage pipe. Orange barrels separate the work area from open lanes, and a semi crosses an overpass in the background.
Close view of a closed ramp to I-94 East with barricades, a "Ramp Closed" sign, and a 20 mph ramp advisory sign. Beyond it, a tanker truck crosses an overpass whose piers are being rebuilt, with a portable toilet and excavator nearby.
Two stacked concrete overpasses supported by column piers. Timber and steel shoring hold up the lower bridge while a worker in a safety vest stands on scaffolding, and traffic passes beneath near an M-39 North mile marker.
Bridge construction site with a large crane boom extending over new concrete abutment walls and exposed green rebar. A wooden safety railing is in the foreground, with workers in high-visibility vests and an excavator beyond.
Muddy haul road with puddles curving through a work site. An excavator digs at left, a red crawler crane stands ahead, and stacks of steel beams line the right side.
Elevated view of wet, barrel-lined freeway lanes beside a graded embankment. A new bridge pier and abutment wall are under construction, a crane sits atop the hill, and barricades block a closed ramp.
Overhead view down I-94 showing the freeway rebuilt from the ground up, with a gravel base and fabric in the center and graded earth beside it. Traffic flows on the right past a Wayne Road exit sign and a roadside billboard.
  • About
    • Project Map
    • Project Timeline
    • Maintenance of Traffic
    • Environmental Impacts
    • Photo Gallery
      • Summer 2026 Construction Progress
      • Existing Roadway Conditions
  • Information Center
    • News & Announcements
    • Public Meetings
    • Frequently Asked Questions
    • Noise Report
  • Contact
  • MiDrive Map

Copyright © 2025- 2026 | This is not an official State of Michigan website. | All rights reserved.

Privacy Policy | Accessibility Statement
Subscribe for Updates